The Department of Public Works is repairing a water main break on Neckel St. The water will be turned off between Blesser and Henson during the repair. Please avoid this area while crews are working, and review the following water use instructions once service is restored.
City leaf collection crews will begin work in the Area Above Ford Field and the Nash Subdivision Area on Saturday, Nov. 22, 2025. Cars should be removed from the streets in this area while loose leaf collection is ongoing and signs are present.
Consists of five members, including a building contractor, a registered architect/engineer, a citizen member, a member of City council or designee, a registered building official, and a plan reviewer or inspector.
The Demolition Board of Appeals meets as necessary. All meeting notices are posted to the City website in advance.
Appointed: 05/25/2023
Term Ends: 06/30/2026
Reappointed: 06/10/2025
Term Ends: 06/30/2028
Appointed: 10/20/2022
Term Ends: 06/30/2025
Reappointed: 06/10/2025
Term Ends: 06/30/2028